Sunday, November 23, 2008

Week Eight - Walls up to three meters

This week we are starting on the top level of the walls up to the future roof level. The wall on the left is about 12 centimeters higher than the wall on the right for water runoff. You can't allow water to drain into your neighbors yard if you are on the lot line - and we are on the lot line on two sides.

We had to build an A-frame scaffold for solid support when working 3 meters up. I also bought a 2x10 by 10 feet to use as a platform. The thin 1x8 palm boards used for cement forms were not stable enough.

View from back neighbors lot

View of one bedroom - A-Frame scaffold partly shown


Building a small house in Pinal Villa, Costalegre

Tuesday, November 11, 2008

Weeks Six and Seven

They finished the walls to the two meter level and now it's time to tie it all together with a cement header (dala) all the way around. Today they will finish pouring the header on the two rooms in the back .... and them on to the front two rooms. We're also putting some of the electrical tubing in the dalas so the roof installation will have a few less to do. The routing of the wires is not what I would have chosen but unless I'm there all day to check ... and I've been feeling under the weather this week. Anything can be re-done by chipping away the cement and brick and that's what they rely one.

Beginning of week Six

Toward end of week Six

Week Seven and dalas (headers) are started

Rebar for dalas almost in place and cement forms starting

I added this foto from the end of week seven to show the headers with forms off

Building a small house on the Costalegre, Jalisco Mexico

Sunday, November 2, 2008

The roof maze

This is the maze we are going to deal with someday when we put on the roof. The foto below is of a soon to be multi-story so we'll have no plumbing extending up - but all the electric will be in the ceiling. Most plumbing in Mexico is also on the roof because that is where your water storage tank is unless you have a pressure system. The foam is both to lighten the load and to better insulate from the sun. The orange tubing is where the electrical wires are run - after


Building a house in Pinal Villa, Costalegre, Jalisco

Thursday, October 30, 2008

Putting up more walls - Week Five

This week we are finishing up the walls of two rooms of the four and putting up half walls of the last two. The half walls you see are one meter and they stop there so as to not put too much weight on the wet mortar

The second foto shows how the wooden forms are held in place for the castillos. They push a stick through the wet mortar as they lay brick (rather than drilling holes later) and use wire to attach the boards. The brick and smaller board make a lever to hold the forms close.

The bottom foto is how one of the neighbors brings out water from his place because the street water has been shut off for two days. Like siphoning gas out of a car, we suck on the hose and get 55 gallons mas o menos.

A couple of windows in front and more second level walls


Forms for the castillos (upright beams)


The neighbor brings water needed to mix mortar
House building in Pinal Villa, Costalegre, Mexico

Wednesday, October 22, 2008

Week Four - Starting on the walls

We finally got some clay brick but started with cement block just so they could go to work. Both bricks are nearly the same size. There is a regular brick and an over-sized. We're using the larger which will use less cement and go up faster - the problem is they are not as easily found and do cost more. The first section laid is a meter high so the weight does not compress the wall. One meter is also the standard window height

The bottom foto shows how when working with block, they insert a few rows of clay brick because clay is more flexible and will relieve earthquake stress on the walls.

From lot next door

Mixing the bricks

Example from other construction - A few rows of clay brick for stress relief

Building a house in Pinal Villa, Costalegre, Jalisco