The Canadians are back for their second year of construction. Got a bit of a late start so this is only week three. Oscar thinks they can get the roof on before the end of January when they head back to Canada. I sure hope so. This place is in Melaque, across the canal at the foot of the hill on Bugambilias.
Showing posts with label building. Show all posts
Showing posts with label building. Show all posts
Tuesday, November 29, 2016
Sunday, January 24, 2016
Last Saturday for construction
Four more days starting Monday and then the Canadians will head back North A tiny bit more than two months and they got a lot done. It was planned for a full three months but much confusion about Seguro and a crazy Presta Nombre that had to do things her way even if they made no sense. We're hoping next year in November things will be a lot smoother.
Building my house we had many Carne Asada parties and we figured their last Saturday was a good time to have one. Good food, fun time and lots of beer.
Labels:
beer,
building,
carne asada,
construction,
house,
Presta Nombre,
Seguro
Saturday, March 28, 2009
Electric installed and Septic dug - Week 23
Another week of not getting a lot done as far as man hours but still major accomplishments. Went into CFE (electric company) on Monday and they had the service installed the next morning. I paid nothing up front and told to just pay the first bill.
Was supposed to get the septic dug Thursday afternoon but the guy came up on his scooter and said his machine had a flat. Made an appointment for 8:30 Friday morning and he showed up about 10:30. When he moved the gravel he broke the water line but we'll fix that next week.
Still not sure about Chui so next week Pedro, Jorge and I will be working on cutting the brick for electrical and incoming water (you have to inlay the pipes in the wall)
Was supposed to get the septic dug Thursday afternoon but the guy came up on his scooter and said his machine had a flat. Made an appointment for 8:30 Friday morning and he showed up about 10:30. When he moved the gravel he broke the water line but we'll fix that next week.
Still not sure about Chui so next week Pedro, Jorge and I will be working on cutting the brick for electrical and incoming water (you have to inlay the pipes in the wall)


Slow house building in Mexico
Sunday, November 23, 2008
Week Eight - Walls up to three meters
This week we are starting on the top level of the walls up to the future roof level. The wall on the left is about 12 centimeters higher than the wall on the right for water runoff. You can't allow water to drain into your neighbors yard if you are on the lot line - and we are on the lot line on two sides.
We had to build an A-frame scaffold for solid support when working 3 meters up. I also bought a 2x10 by 10 feet to use as a platform. The thin 1x8 palm boards used for cement forms were not stable enough.
We had to build an A-frame scaffold for solid support when working 3 meters up. I also bought a 2x10 by 10 feet to use as a platform. The thin 1x8 palm boards used for cement forms were not stable enough.
View from back neighbors lot
View of one bedroom - A-Frame scaffold partly shown
Building a small house in Pinal Villa, Costalegre
Labels:
building,
Costalegre,
Pinal Villa,
roof,
scaffold,
wall,
water runoff
Sunday, November 2, 2008
The roof maze
This is the maze we are going to deal with someday when we put on the roof. The foto below is of a soon to be multi-story so we'll have no plumbing extending up - but all the electric will be in the ceiling. Most plumbing in Mexico is also on the roof because that is where your water storage tank is unless you have a pressure system. The foam is both to lighten the load and to better insulate from the sun. The orange tubing is where the electrical wires are run - after
Labels:
building,
Costalegre,
electric,
foam,
Jalisco,
Pinal Villa,
plumbing,
roof
Thursday, October 30, 2008
Putting up more walls - Week Five
This week we are finishing up the walls of two rooms of the four and putting up half walls of the last two. The half walls you see are one meter and they stop there so as to not put too much weight on the wet mortar
The second foto shows how the wooden forms are held in place for the castillos. They push a stick through the wet mortar as they lay brick (rather than drilling holes later) and use wire to attach the boards. The brick and smaller board make a lever to hold the forms close.
The bottom foto is how one of the neighbors brings out water from his place because the street water has been shut off for two days. Like siphoning gas out of a car, we suck on the hose and get 55 gallons mas o menos.
The second foto shows how the wooden forms are held in place for the castillos. They push a stick through the wet mortar as they lay brick (rather than drilling holes later) and use wire to attach the boards. The brick and smaller board make a lever to hold the forms close.
The bottom foto is how one of the neighbors brings out water from his place because the street water has been shut off for two days. Like siphoning gas out of a car, we suck on the hose and get 55 gallons mas o menos.
A couple of windows in front and more second level walls
Forms for the castillos (upright beams)
The neighbor brings water needed to mix mortar House building in Pinal Villa, Costalegre, Mexico
Sunday, October 12, 2008
Our lots in Pinal Villa, Melaque
These are fotos of our lots in Pinal Villa about a mile back from the beach and directly behind Melaque. I looked for lots for over a year and was about 2-3 years late to find real bargains. Prices closer to the beach doubled and tripled in that amount of time. Even though there were a number of lots in our price range back from the beach, many didn't have water or electricity. Pinal Villa still does not have Telmex (phone) services.
I found the lot in the first foto last winter but the family member of the adjoining lot didn't want to sell at the time. He later called us to see if we were still interested.
The two people sitting in the back of the first foto are Canadians who own three lots behind us and are building two casitas. They only plan to work on their place during the winter and I'm not sure they will finish this year.
I found the lot in the first foto last winter but the family member of the adjoining lot didn't want to sell at the time. He later called us to see if we were still interested.
The two people sitting in the back of the first foto are Canadians who own three lots behind us and are building two casitas. They only plan to work on their place during the winter and I'm not sure they will finish this year.
The lots last winter with Canadians sitting on lot behind
Costalegre, Jalicso, Mexico
Labels:
building,
casitas,
Costalegre,
lot,
Melaque,
Mexico,
Pinal Villa
Thursday, September 25, 2008
Building a house in Mexico
Building a house in Mexico
A small place in Pinal Villa, Costalegre
Pinal Villa is a small community about a mile behind Melaque, Jalisco on the Costalegre, Mexico.
I bought the first of two lots in November of 2007 and the second adjoining lot in the summer of 2008. What we paid is less important than to say they were equal to less developed lots that had no water or electricity and no neighbors to share the costs.
I've learned a lot and am still learning - but the first lesson was to fence and mark your lot well because the Ejido will just go by fence lines and ignore what your original paperwork says. We lost almost three feet off the back and a foot or two on one side. Many of the lots in Pinal Villa are un-plotted (not on a map) so had to be re-measured.
The cost of title transfer is only per square meter and doesn't matter if there is a house or vacant lot. For us it was about $2500 pesos. If the previous owner has not paid taxes or have receipts you need to pay the last 5 years - $100 pesos a year.
Building in Pinal Villa Web Page
Costalegre, Jalicso, Mexico
Labels:
building,
Costalegre,
house,
Jalicso,
lot,
Melaque,
Mexico,
Pinal Villa
Subscribe to: