Oscar is my maestro and here is finishing up the last part of the rough stucco (enjarrar). The music in the background is what we listen to all day ... and the other noise is Hugo mixing more mortar.
Showing posts with label casa. Show all posts
Showing posts with label casa. Show all posts
Friday, January 14, 2011
Thursday, December 11, 2008
Semana Diez para la Casa
Updates may be every two weeks but we will see. Putting up walls is only so interesting. Last week we finished the walls to roof level and installed a support beam across the larger front room. This week we've started on the second stage of walling off the back of both lots, stairs and a wash-utility-storage area. I have no exact measurements for this utility area so we will wait for walls and when the dirt is removed, mark it out. The jog that you can almost see in the second foto is because both lots are not the same size
Roof support beam for the large room
Second stage foundation
Second stage from roof levelRetired and building a small house in Villa Pinal, Costalegre, Jalisco Mexico
Labels:
casa,
Costalegre,
Jalisco,
Mexico,
Pinal Villa,
utility area,
wall
Wednesday, October 22, 2008
Week Four - Starting on the walls
We finally got some clay brick but started with cement block just so they could go to work. Both bricks are nearly the same size. There is a regular brick and an over-sized. We're using the larger which will use less cement and go up faster - the problem is they are not as easily found and do cost more. The first section laid is a meter high so the weight does not compress the wall. One meter is also the standard window height
The bottom foto shows how when working with block, they insert a few rows of clay brick because clay is more flexible and will relieve earthquake stress on the walls.
The bottom foto shows how when working with block, they insert a few rows of clay brick because clay is more flexible and will relieve earthquake stress on the walls.
From lot next door
Mixing the bricks
Example from other construction - A few rows of clay brick for stress reliefBuilding a house in Pinal Villa, Costalegre, Jalisco
Labels:
block,
brick,
casa,
cement,
clay,
earthquake,
Pinal Villa,
stress
Tuesday, October 14, 2008
Building the foundation - Week Two
Our first albaniel turned out to be fast but very little thought was going into what he was doing. There were not enough support columns (castillos) for our spans and bathrooms were not planned. We added 7 new columns - 5 down the middle and two on either side of the large front room.
The bottom foto is of the reinforced 'header' (dala) that goes above the block, the top of which will be the floor level. I rented the wood for forms but will buy some next time as we'll use them multiple times.
The bottom foto is of the reinforced 'header' (dala) that goes above the block, the top of which will be the floor level. I rented the wood for forms but will buy some next time as we'll use them multiple times.
Adding the extra castillos
The dala - header
Building a house in Pinal Villa, Costalegre, Jalisco