We have roof (supports)

When cement roofs are poured they require lots of support to hold the weight and also just something for the cement to sit on (obvious). Well here we needed three loads of flat lumber and support posts to hold a 125 meter roof. Took the crew a day and a half to put it up and the wood will remain for a little over two weeks while the cement cures and dries.

The roof actually got poured yesterday (Saturday) and I've begun the twice a day watering (sunset and sunrise) to let it dry slowly. So far the crews have been great and priced under estimates. Next will be about the roof pour and preparation.

One load of lumber

Filling rooms with support posts

Roof is about half done

All wood supports in, rebar in along with plumbing and electrical

Cement roof in Mexico

Sunday, October 31, 2010

Finished another 2 weeks work

Got the same good crew back that built the bodega and plan to finish the plumbing, electric and roof in the next few weeks. Made a lot of changes of windows and doors, opened up the inside of the house, added another room off the front side. Extended the bathrooms a few feet so everything is inside. No sink in the bedrooms (motel style). The roof also had a 20mm pitch and we decided to level it for future construction above. I eliminated the back bathroom and will just use the old bedroom area as a bodega and workshop.

Next week will be the wooden supports for the roof pour and then installing the electric and plumbing on top of the supports along with a large amount of rebar. We also decided to run a beam the length of the house that will be hidden inside the cement (not showing above or below).

Foundation of new room

Walls almost up on new room

New doorways through the house

Sunday, November 2, 2008

The roof maze

This is the maze we are going to deal with someday when we put on the roof. The foto below is of a soon to be multi-story so we'll have no plumbing extending up - but all the electric will be in the ceiling. Most plumbing in Mexico is also on the roof because that is where your water storage tank is unless you have a pressure system. The foam is both to lighten the load and to better insulate from the sun. The orange tubing is where the electrical wires are run - after


Building a house in Pinal Villa, Costalegre, Jalisco

Related Posts Plugin for WordPress, Blogger...