Showing posts with label step. Show all posts
Showing posts with label step. Show all posts

Sunday, February 27, 2011

Redesigning the Stairs

The stairs were unfinished and I knew we'd get around to it someday. The cement block is porous and has been letting water seep into the bathroom below. What I wasn't expecting was for my maestro to figure out a way to rebuild the stairs giving them a proper "run" (step space) compared to the very narrow original steps. He added the extra couple inches to each step by adding an angled step on what used to be the bottom platform.

To add a bullnose to each step he cuts a 2" tube in half and nails it to the step form. For a non-slip surface we used 'granito' (granite chunks) in the cement and then wash away enough cement to expose the chucks.


The old stairs

Rebuilding begins

Plastic tube cut in half for 'bullnose'

Finished stairs

The added step on the bottom

Tuesday, January 6, 2009

Lucky Week Thirteen

After a paid vacation over Christmas week and a paid New Years day the back of both lots are walled, a 5 meter lot divider almost finished and the stairs are started. The vacation was a kind of aguinaldo which is common in Mexico at the end of the year. Normally the aguinaldo is equivalent to 15 days pay if they have worked all year and is paid by the 20th of December for buying Xmas presents, food and fiesta.

We finally have a stair plan and that is up the back wall with a 2 step approach to a one meter landing. Under the stairs will be walled for a small bodega (storage). If any more stair work is done this week I'll add a few fotos at the bottom.

Back of lot walls, divider wall and 2 steps of the stairs

Platform at the beginning of stairway - one meter wide all the way up
Related Posts Plugin for WordPress, Blogger...