Wednesday, January 13, 2016

Dala work last week



Last week was only about week five and the dala was finished all the way around. This week it's cleanup and starting laying brick on the back wall. Muy bien trabajo and everybody is happy except for the Presta Nombre from HELL.

Monday, December 28, 2015

Moving right along


West Melaque Project

That back wall is not the edge of the lot, it's the first foundation for the house. Oscar is laying rock down the middle that will divide the kitchen from the back bedroom. Going very smoothly and the workers have Seguro even though they don't need it for foundation work. They got Seguro because their Presta Nombre is a totally crazy and paranoid woman. She acts like she thinks the lot is still hers.

Tuesday, November 4, 2014

Lockdown my meters and a wall painting

CFE is installing Not Very Smart Meters and not always with the owners permission. The first complaint is that you can only pay at CFE offices. The second complaint is that you/we have to read it every month with a magic card and go pay at CFE. The third complaint is you can't pay for six months and go away. This is all about saving CFE money with no meter readers .... but at huge public expense.

I wasn't going to take a chance that some commission based installer make a few pesos off my meter when I wasn't looking.The locked door also keeps the bugs and rain out.


Linda painted her garden walls and I wanted to do something with the back wall of the palapa. We both painted my wall last winter when she was here. Problem was I didn't like it so painted over with white once again. I finally broke down yesterday and spent a few hours trying something new. Not finished so I can add and/or paint it white again. Interesting to work only with the primary colors and black


Tuesday, April 17, 2012

Cutting up my house

After two days of digging this trench in the side of my house they are finished and the wood support guys are ready to build the forms in the afternoon tomorrow. Only a half day job they say so my guys are going to knock down the lower one foot "awning" in the morning. We waited for over 3 hours for the wood support guy to show up and just sat, talked and thought about future projects.  I had no problem with them taking it easy after a day and a half of operating that jackhammer.   Not nice work!

We cleaned up the mess from all the falling concrete but will have another pile tomorrow including a bunch of wire mesh Styrofoam .... not easy to get rid of. In the afternoon my guys will start on two more columns for another ramada over the very ugly cistern that sticks up out of my yard.

Saturday, February 7, 2009

Cistern patio and walls - Week seventeen

The top of the cistern would have made a huge table but at only knee high we would have had to excavate for seating. Nope wasn't gonna work so I asked them to make a rectangle we could use it as a small patio - covered someday. Here they are blending the rectangle top with the circular one.

The bottom foto is the foundation for the lot sidewall. Just ordered another 1000 blocks for the front wall foundation and the septic tank.

Cistern patio from the corner of the lot

Sidewall foundation

Construction of small house in Pinal Villa, Costalegre

Saturday, January 24, 2009

Week Fifteen - starting the front yard wall

The new project is the front yard wall with gate opening and space for air flow with security bars. Also installing drain pipes through the wall so rain water has a place to go without forming a lake. The driveway and gate on the second lot will have a low level entrance that will allow water to escape but don't want it collecting near the house. Yes, when it rains here it pours.

The stairs are finished in basic form so I've been studying finished steps in the area to see what we can do. The cover coat will be pure cement with a little sand for traction. You can make a 'bull nose' extension off the lip of the step formed with plastic pipe that looks very nice but may be trickier than I think.

Some second floor views and my neighbors progress on property walls.


Latest project is front wall and rain water drainage

Finished steps (basic form)

From top of steps looking towards the ocean and Melaque

Canadian neighbors progress - just walls this year

Pinal Villa house

Thursday, December 11, 2008

Semana Diez para la Casa

Updates may be every two weeks but we will see. Putting up walls is only so interesting. Last week we finished the walls to roof level and installed a support beam across the larger front room. This week we've started on the second stage of walling off the back of both lots, stairs and a wash-utility-storage area. I have no exact measurements for this utility area so we will wait for walls and when the dirt is removed, mark it out. The jog that you can almost see in the second foto is because both lots are not the same size

Roof support beam for the large room

Second stage foundation

Second stage from roof level

Retired and building a small house in Villa Pinal, Costalegre, Jalisco Mexico

Sunday, November 23, 2008

Week Eight - Walls up to three meters

This week we are starting on the top level of the walls up to the future roof level. The wall on the left is about 12 centimeters higher than the wall on the right for water runoff. You can't allow water to drain into your neighbors yard if you are on the lot line - and we are on the lot line on two sides.

We had to build an A-frame scaffold for solid support when working 3 meters up. I also bought a 2x10 by 10 feet to use as a platform. The thin 1x8 palm boards used for cement forms were not stable enough.

View from back neighbors lot

View of one bedroom - A-Frame scaffold partly shown


Building a small house in Pinal Villa, Costalegre