Earth bag construction on the Costalegre
Sunday, May 3, 2009
Front gates installed
Definitely not the strongest protection in the world but we can always beef it up later. This will work to deter people with a minor interest in looking around but there will be little there to see - kids have used it as a playground.
I've been moving the stacks of brick and block over to the side so we can level the lot and cover the septic. Still have to move a large pile of gravel and then a much larger pile of dirt .... so will probably enlist a neighbor for that. I want the lot level with a slight slope towards the street before the rains. Not ready for turf yet so may bring some grass seed to hold things together
I think on the last post I called the fencing material Maya Ciclon but on the ferretería bill it was called Malla Ciclon. Pronounced the same but interesting
Installers putting in the last section
Complete from the outside
Added the window bars this morning (the 5th)
Villa Pinal, Melaque, Costalegre
Saturday, February 7, 2009
Cistern patio and walls - Week seventeen
The bottom foto is the foundation for the lot sidewall. Just ordered another 1000 blocks for the front wall foundation and the septic tank.
Cistern patio from the corner of the lot
Sidewall foundation
Construction of small house in Pinal Villa, Costalegre
Thursday, December 11, 2008
Semana Diez para la Casa
Retired and building a small house in Villa Pinal, Costalegre, Jalisco Mexico
Sunday, November 23, 2008
Week Eight - Walls up to three meters
We had to build an A-frame scaffold for solid support when working 3 meters up. I also bought a 2x10 by 10 feet to use as a platform. The thin 1x8 palm boards used for cement forms were not stable enough.
View from back neighbors lot
View of one bedroom - A-Frame scaffold partly shown
Building a small house in Pinal Villa, Costalegre
Tuesday, November 11, 2008
Weeks Six and Seven
Beginning of week Six
Toward end of week Six
Week Seven and dalas (headers) are started
Rebar for dalas almost in place and cement forms starting
I added this foto from the end of week seven to show the headers with forms off
Building a small house on the Costalegre, Jalisco Mexico
Sunday, November 2, 2008
The roof maze
Wednesday, October 15, 2008
Building the foundation - Week Three
The dirt (arena) is from Aguacate and looks like sand but has clay in it that compacts well. There are a few large pieces in it that are cement stone like but break up easily. This stuff is what is normally used below a slab. We ended up with about a 1/2 truck extra and will have to use it elsewhere.
Can't spread it out over the yard as it will make terrible soil for a garden. 3 truck loads and the tractor for half a day was $2500 pesos.
Pinal Villa, Costalegre, Jalisco
Tuesday, October 14, 2008
Building the foundation - Week Two
The bottom foto is of the reinforced 'header' (dala) that goes above the block, the top of which will be the floor level. I rented the wood for forms but will buy some next time as we'll use them multiple times.
Adding the extra castillos
The dala - header
Building a house in Pinal Villa, Costalegre, Jalisco
Sunday, October 12, 2008
Our lots in Pinal Villa, Melaque
I found the lot in the first foto last winter but the family member of the adjoining lot didn't want to sell at the time. He later called us to see if we were still interested.
The two people sitting in the back of the first foto are Canadians who own three lots behind us and are building two casitas. They only plan to work on their place during the winter and I'm not sure they will finish this year.
Costalegre, Jalicso, Mexico
Thursday, September 25, 2008
Building a house in Mexico
Building a house in Mexico
A small place in Pinal Villa, Costalegre
Pinal Villa is a small community about a mile behind Melaque, Jalisco on the Costalegre, Mexico.
I bought the first of two lots in November of 2007 and the second adjoining lot in the summer of 2008. What we paid is less important than to say they were equal to less developed lots that had no water or electricity and no neighbors to share the costs.
I've learned a lot and am still learning - but the first lesson was to fence and mark your lot well because the Ejido will just go by fence lines and ignore what your original paperwork says. We lost almost three feet off the back and a foot or two on one side. Many of the lots in Pinal Villa are un-plotted (not on a map) so had to be re-measured.
The cost of title transfer is only per square meter and doesn't matter if there is a house or vacant lot. For us it was about $2500 pesos. If the previous owner has not paid taxes or have receipts you need to pay the last 5 years - $100 pesos a year.
Building in Pinal Villa Web Page
Costalegre, Jalicso, Mexico