Tuesday, November 4, 2014

Lockdown my meters and a wall painting

CFE is installing Not Very Smart Meters and not always with the owners permission. The first complaint is that you can only pay at CFE offices. The second complaint is that you/we have to read it every month with a magic card and go pay at CFE. The third complaint is you can't pay for six months and go away. This is all about saving CFE money with no meter readers .... but at huge public expense.

I wasn't going to take a chance that some commission based installer make a few pesos off my meter when I wasn't looking.The locked door also keeps the bugs and rain out.


Linda painted her garden walls and I wanted to do something with the back wall of the palapa. We both painted my wall last winter when she was here. Problem was I didn't like it so painted over with white once again. I finally broke down yesterday and spent a few hours trying something new. Not finished so I can add and/or paint it white again. Interesting to work only with the primary colors and black


Saturday, March 28, 2009

Electric installed and Septic dug - Week 23

Another week of not getting a lot done as far as man hours but still major accomplishments. Went into CFE (electric company) on Monday and they had the service installed the next morning. I paid nothing up front and told to just pay the first bill.

Was supposed to get the septic dug Thursday afternoon but the guy came up on his scooter and said his machine had a flat. Made an appointment for 8:30 Friday morning and he showed up about 10:30. When he moved the gravel he broke the water line but we'll fix that next week.

Still not sure about Chui so next week Pedro, Jorge and I will be working on cutting the brick for electrical and incoming water (you have to inlay the pipes in the wall)





Slow house building in Mexico

Saturday, March 21, 2009

Electric and Drainage - Week 22

Chui is still not feeling well enough to get back to work after his fall and may require next week off as well. This week I got the plumber/electrician out and we put in the drainage for 3.5 bathrooms (outside wash basin below the stairs and a toilet under them).

I was advised to buy a 4 meter pole for the electrical hookup but it turns out is was too long and wouldn't be well supported. We cut it back to almost 3 meters and cemented the castillo (column) around it. Then installed the two meter bases (basos) and installed a main breaker for each meter behind the wall. Also one outlet so have electric on the site. Will be headed for the CFE office in Cihuatlan next week to apply for installation from the pole.

Drainage plumbing runs along the outside of the house to a connection box (registro)

Breakers and an outlet

Two meter bases (basos)