More rain preparation

In the previous post you can see the beginning of the drainage we turned around from the yard next door - into my yard. You just can't dump any amount of water on you neighbors no mater how small the amount. It's now all stuccoed, sealed and painted just waiting for impermeabilizante covered cloth.

Second project was beefing up my front sidewalk. Three downspouts dump water on it, ants build caves under it, chickens excavate the edges looking for bugs .... and then there's the kids who like the sidewalk and the dirt in front of it. I told Hugo generally what I wanted and let him make the design decisions. I like what he came up with. A little more on the driveway to go.

The final is my north wall.  Because someday (maybe never) there will be a house up against that wall I didn't worry too much about the stucco and it is pretty sloppy and very ruff. I also cut corners on properly sealing and painting it. Shoe had a couple 5 gallons of cheap paint that was old so I mixed that with a little sealer and some decent paint but not semi-gloss. I'll only paint with semi-gloss from now on.  

So I figured I'd clean it up, primer a few areas and let Hugo go at it with a roller. Turns out I have wire brushed and/or cleaned with Clorox almost the whole wall. Also it's so ruff that doing a good job with a roller is almost impossible and you can't see your holidays 10-12 feet above you.  I will end up painting that whole 20x4 meter wall with a brush. Plenty of other painting for Hugo.

The second sidewalk

North wall mostly painted - sealed the bottom section today

20 meters by 4 high

Saturday, December 11, 2010

Grey water and sewer

The last couple of days has been connecting the grey water from the upstairs laundry to a new fosa (septic) and registro (connection box). Since we don't have sewer in Pinal Villa everyone has septic tanks and it's not a good idea to mix laundry water with bathroom drainage. Also the house is 20 meters long and roof drainage may be an issue next summer. I may install an extra downspout beside the 3 roof drains in front.

Since we may have city sewer some day, the connection box will be used to redirect water to the street. The normal house drainage also has it's own connection box that can be directed to either the street or a separate septic. Both of these systems will meet next to the street in another connection box that the city will hook up to. A bit complicated but it should work well and I shouldn't have to re-engineer anything.

Six guys working on the house today kept me running!


Grey water fosa and registro

Putting a top on it

Grey water and black water will meet in a registro here and be connected to city sewer

Saturday, September 11, 2010

Last week at the place

Spent last week in Melaque moving stuff down and cleaning up the place. So much rain and water everywhere I only spent a day and a half on the lot. Roads were almost impossible if not paved. The tarp covering the trailer was in shreds from an earlier wind storm so now it's uncovered.

Lots of weeding and moving dirt around for better drainage. With another trip to CFE I finally got the power turned back on even tho I'd paid the bill over a month ago plus extra to carry over into November/December. More storage shelves for the trailer and bodega. No water again so I couldn't test for the one water leak I found last trip. It's an incoming line in the ground so not a big deal.

Saturday, March 21, 2009

Electric and Drainage - Week 22

Chui is still not feeling well enough to get back to work after his fall and may require next week off as well. This week I got the plumber/electrician out and we put in the drainage for 3.5 bathrooms (outside wash basin below the stairs and a toilet under them).

I was advised to buy a 4 meter pole for the electrical hookup but it turns out is was too long and wouldn't be well supported. We cut it back to almost 3 meters and cemented the castillo (column) around it. Then installed the two meter bases (basos) and installed a main breaker for each meter behind the wall. Also one outlet so have electric on the site. Will be headed for the CFE office in Cihuatlan next week to apply for installation from the pole.

Drainage plumbing runs along the outside of the house to a connection box (registro)

Breakers and an outlet

Two meter bases (basos)

Saturday, January 24, 2009

Week Fifteen - starting the front yard wall

The new project is the front yard wall with gate opening and space for air flow with security bars. Also installing drain pipes through the wall so rain water has a place to go without forming a lake. The driveway and gate on the second lot will have a low level entrance that will allow water to escape but don't want it collecting near the house. Yes, when it rains here it pours.

The stairs are finished in basic form so I've been studying finished steps in the area to see what we can do. The cover coat will be pure cement with a little sand for traction. You can make a 'bull nose' extension off the lip of the step formed with plastic pipe that looks very nice but may be trickier than I think.

Some second floor views and my neighbors progress on property walls.


Latest project is front wall and rain water drainage

Finished steps (basic form)

From top of steps looking towards the ocean and Melaque

Canadian neighbors progress - just walls this year

Pinal Villa house

Related Posts Plugin for WordPress, Blogger...