Saturday, December 11, 2010

Grey water and sewer

The last couple of days has been connecting the grey water from the upstairs laundry to a new fosa (septic) and registro (connection box). Since we don't have sewer in Pinal Villa everyone has septic tanks and it's not a good idea to mix laundry water with bathroom drainage. Also the house is 20 meters long and roof drainage may be an issue next summer. I may install an extra downspout beside the 3 roof drains in front.

Since we may have city sewer some day, the connection box will be used to redirect water to the street. The normal house drainage also has it's own connection box that can be directed to either the street or a separate septic. Both of these systems will meet next to the street in another connection box that the city will hook up to. A bit complicated but it should work well and I shouldn't have to re-engineer anything.

Six guys working on the house today kept me running!


Grey water fosa and registro

Putting a top on it

Grey water and black water will meet in a registro here and be connected to city sewer

Monday, April 27, 2009

The septic tank is finished

Chui is just filling in around the sides today. They finished the top Saturday working pretty late (well almost). After the cement pour, it needs to dry for two hours before putting a cement wash over as a sealer. We had borrowed a neighbor for the cement mixing and for two hours we drank caguamas along with a few other neighbors. Saturdays are usually half days but we finished up after 4 PM.

The top will sit for a week before covering to allow it to dry ... and doused with water so it dries slowly. The registro shown below is the connection box and also a cleanout. Not sure if a registro is a fall back to pre-plastic days when joining a bunch of pipes was difficult but it was insisted upon. We also added a capped pipe to the street in the event we get a sewer system in Pinal

I found a guy for gates and windows today so that's the next project before we close up shop for however long. Might as well secure the place. Just decided on metal frames for the gates with Cyclone fencing (maya ciclon) welded on. Will have normal bars on the two front house windows


Building the box

The registro or connection box for pipes

Wood forms and rebar (varilla) for the top

Starting the pour

Saturday, March 28, 2009

Electric installed and Septic dug - Week 23

Another week of not getting a lot done as far as man hours but still major accomplishments. Went into CFE (electric company) on Monday and they had the service installed the next morning. I paid nothing up front and told to just pay the first bill.

Was supposed to get the septic dug Thursday afternoon but the guy came up on his scooter and said his machine had a flat. Made an appointment for 8:30 Friday morning and he showed up about 10:30. When he moved the gravel he broke the water line but we'll fix that next week.

Still not sure about Chui so next week Pedro, Jorge and I will be working on cutting the brick for electrical and incoming water (you have to inlay the pipes in the wall)





Slow house building in Mexico

Thursday, March 12, 2009

I guess this is week 21

We have just been finishing up walls around the lots so not much there. My albañil fell off the scaffolding on Monday from 2 meters up. Nothing broken but scraped and bruised. Doctor told him to take 3 days off and we've since decided the whole weeks rest is better.

Next week we will be working on the electric pole, the support castillo, meter base, a breaker and plug. If we have time will start on the septic and drainage lines

The septic (fosa septica) will look something like this

Saturday, February 7, 2009

Cistern patio and walls - Week seventeen

The top of the cistern would have made a huge table but at only knee high we would have had to excavate for seating. Nope wasn't gonna work so I asked them to make a rectangle we could use it as a small patio - covered someday. Here they are blending the rectangle top with the circular one.

The bottom foto is the foundation for the lot sidewall. Just ordered another 1000 blocks for the front wall foundation and the septic tank.

Cistern patio from the corner of the lot

Sidewall foundation

Construction of small house in Pinal Villa, Costalegre