Wednesday, May 9, 2012

New palapa ramada

I've been threatening to put a palapa or lamina ramada over the ugly cement box in my yard that covers my cistern and finally decided to do it last week. They finished Saturday. These were friends of one of my cement workers and the total charge was 8000 pesos ($700us) including the wood frame and the palapa install. My guys put up the cement posts a few weeks ago using Sonotubes.

The project pretty much took over the whole yard so my cement guys took a break and helped the 'palaperos' from time to time. All the palms are nailed on rather than tied.  The crown has a piece of black plastic (1x5 meters) and then covered by palm fronds and tied down with wire.

After they left we gathered under the palapa, had a few 'cubas' (coke and tequila) followed by tacos de carne asada. Very satisfying day.

Palapas arrive

Starting on the first course

Getting near the peak

Starting on the other side with dad below

The boss putting on the crown

All finished

Tuesday, May 1, 2012

House projects

I posted this on my main blog but also added two more fotos here. They delivered most of the wood for the palapa today and will bring more and start the wood finishing tomorrow. Also all the marquesina forms are down and the finish work underneath has started.


I consider these finishing touches to a house that began very simple and not all that well planned. The largest is the awning (marquesina) along the house that will help keep rain away from doors and windows. Oscar is up there now filling the joints between the awning and the house that they had to cut out to attach it.

The second is a palapa over the ugly block of cement that covers the cistern in the middle of the yard. The four posts (castillos) are up and the palapa builder will be here next week to build the wood structure that sits on top. Gonna use the long palapas rather than the royal palm that is very much more expensive. He says with the right pitch and placed close together it should be good for 5 years. We'll see.

The third project is to replace a jury-rigged lamina roof that was over the outside wash and pump area. It will extend out 5 meters rather than the 1.5 meters of the old one. Will be much better protection for the area, equipment and can act as a partial garage. One column of the same type used above and two cement cross supports (vegas) that they just poured this morning.

Posts for palapa, house awning and lamina supports

New lamina supports for utility area

Soon to be covered with a palapa

Another view of the house awning

Palapa wood (madera)

Cement finishing

Monday, April 23, 2012

Pouring the marquesina

They poured it on Saturday starting about 9 and finished at 1pm. Rented a mixer and hired two neighbors to help. They dumped the cement on the ground and shoveled it in buckets because there were not enough guys to form a bucket brigade. The machine cost 250 pesos for 4 hours (they gave us no gas) and each of the workers paid 200 pesos each.

It will sit there with supports in place for almost 2 weeks. They will put a leveling finish on it soon. I've been watering it down a few times a day and I removed the cardboard tubes this morning.

Waiting for the cement to cure they are now working on four columns around my ugly cistern top that is over a foot above ground level because my last workers didn't measure the depth of the tank correctly. Hopefully there will be a palapa over it and a tile floor made from the extra house tiles. Just trying to make the outside more livable in our outdoor weather.

Actually finished but can't see from this angle

The first pour

Mixing the cement

Finished product

Thursday, April 19, 2012

Coladores and marquesina supports

The guys that put up the wooden supports for a cement roof are called coladores even tho colador mean a strainer. Guess that will remain a mystery for awhile. In the foto below they are only half finished but had it completed in one afternoon. 5 guys working and they only wanted 1000 pesos. We keep the wood in place for about two weeks while the cement dries.

My workers are starting on the rebar network that will sit on top of the wood to hold the cement together. We needed another load of sand for the cement mix and his price was only 180 pesos

Coladores at work

Sand delivery

Tuesday, April 17, 2012

Cutting up my house

After two days of digging this trench in the side of my house they are finished and the wood support guys are ready to build the forms in the afternoon tomorrow. Only a half day job they say so my guys are going to knock down the lower one foot "awning" in the morning. We waited for over 3 hours for the wood support guy to show up and just sat, talked and thought about future projects.  I had no problem with them taking it easy after a day and a half of operating that jackhammer.   Not nice work!

We cleaned up the mess from all the falling concrete but will have another pile tomorrow including a bunch of wire mesh Styrofoam .... not easy to get rid of. In the afternoon my guys will start on two more columns for another ramada over the very ugly cistern that sticks up out of my yard.