Pouring the marquesina

They poured it on Saturday starting about 9 and finished at 1pm. Rented a mixer and hired two neighbors to help. They dumped the cement on the ground and shoveled it in buckets because there were not enough guys to form a bucket brigade. The machine cost 250 pesos for 4 hours (they gave us no gas) and each of the workers paid 200 pesos each.

It will sit there with supports in place for almost 2 weeks. They will put a leveling finish on it soon. I've been watering it down a few times a day and I removed the cardboard tubes this morning.

Waiting for the cement to cure they are now working on four columns around my ugly cistern top that is over a foot above ground level because my last workers didn't measure the depth of the tank correctly. Hopefully there will be a palapa over it and a tile floor made from the extra house tiles. Just trying to make the outside more livable in our outdoor weather.

Actually finished but can't see from this angle

The first pour

Mixing the cement

Finished product

Saturday, April 14, 2012

Circular columns in place

The columns are up still in the cardboard tubes. They say it doesn't matter when you remove the tubes because the cement shrinks as it ages making it easier. I had them cut off almost a foot and a half from the tops today as the outside edge was just too high and would give less rain protection. Also thinking it would look better lower. For something this heavy (20 sq meters of cement) it has to attach to the re-bar in the roof so height adjustment is not totally flexible. The old marquesina is only a foot wide and made of Styrofoam panel. This will be over 4' wide

With the new angle we're talking about using curved tiles instead of flat over the cement. I really like the look of curved tiles but you can't walk on them if you need to paint or work above. Only the bottom edge of curved tiles are cemented down so maybe the uppers can be moved for access. Next week is renting a machince to cut into the roof and it's rebar and rent some staging so they can work safely 3 meters up.


Foundation footing

Columns in place

Monday, February 22, 2010

New interest in the property

Well my interest is somewhat renewed in the property as well as that of a local store owner. He's going to be looking with family when they get here. My interest was peaked when we found the 3 meter walls would move towards the top when they had only standard width columns (castillos). For that reason they're putting in 5 new castillos next to the existing ones that will act like buttresses. I did not want to get a call that one of the walls collapsed in the next earthquake.

So I spent the last week working on the place and enjoyed it once again. They are also finishing the third meter of the walls that was only 1/4 completed. If they have time they'll paint the rebar. They have all the material and wages for two more weeks work. The lot is cleaned and leveled once again after the rains so should be good for at least 4-5 months before the growth starts.

The bottom foto is of the Canadian neighbors place over my back wall. Really coming along nicely with all the conveniences of home even though they live in their garage. They started the year (November) camping in a tent but now have a real bathroom, electricity, water and a nice garden.


New interest in Pinal Villa property - price went up!