Our neighbors have finally started work this year and began with lot clearing and a cisterna, aljibe or water storage tank. Lots of talk about how to do it, plastic or a cement box, both building a protection wall for the plastic or just put it in the ground. He decided to to do both with a block wall around. Also discussed if it should have a cement floor because the block enclosure can collect water during the rainy season. He opted for a cement floor - we'll see
Thursday, December 11, 2008
My Canadian neighbor putting in a Cisterna
Labels:
aljibe,
block wall,
cistern,
Cisterna,
Water,
water storage
Semana Diez para la Casa
Updates may be every two weeks but we will see. Putting up walls is only so interesting. Last week we finished the walls to roof level and installed a support beam across the larger front room. This week we've started on the second stage of walling off the back of both lots, stairs and a wash-utility-storage area. I have no exact measurements for this utility area so we will wait for walls and when the dirt is removed, mark it out. The jog that you can almost see in the second foto is because both lots are not the same size
Retired and building a small house in Villa Pinal, Costalegre, Jalisco Mexico
Labels:
casa,
Costalegre,
Jalisco,
Mexico,
Pinal Villa,
utility area,
wall
Sunday, November 23, 2008
Week Eight - Walls up to three meters
This week we are starting on the top level of the walls up to the future roof level. The wall on the left is about 12 centimeters higher than the wall on the right for water runoff. You can't allow water to drain into your neighbors yard if you are on the lot line - and we are on the lot line on two sides.
We had to build an A-frame scaffold for solid support when working 3 meters up. I also bought a 2x10 by 10 feet to use as a platform. The thin 1x8 palm boards used for cement forms were not stable enough.
We had to build an A-frame scaffold for solid support when working 3 meters up. I also bought a 2x10 by 10 feet to use as a platform. The thin 1x8 palm boards used for cement forms were not stable enough.
View from back neighbors lot
View of one bedroom - A-Frame scaffold partly shown
Building a small house in Pinal Villa, Costalegre
Labels:
building,
Costalegre,
Pinal Villa,
roof,
scaffold,
wall,
water runoff
Tuesday, November 11, 2008
Weeks Six and Seven
They finished the walls to the two meter level and now it's time to tie it all together with a cement header (dala) all the way around. Today they will finish pouring the header on the two rooms in the back .... and them on to the front two rooms. We're also putting some of the electrical tubing in the dalas so the roof installation will have a few less to do. The routing of the wires is not what I would have chosen but unless I'm there all day to check ... and I've been feeling under the weather this week. Anything can be re-done by chipping away the cement and brick and that's what they rely one.
Beginning of week Six
Toward end of week Six
Week Seven and dalas (headers) are started
Rebar for dalas almost in place and cement forms starting
I added this foto from the end of week seven to show the headers with forms off
Building a small house on the Costalegre, Jalisco Mexico
Labels:
brick,
cement,
Costalegre,
dala,
header
Sunday, November 2, 2008
The roof maze
This is the maze we are going to deal with someday when we put on the roof. The foto below is of a soon to be multi-story so we'll have no plumbing extending up - but all the electric will be in the ceiling. Most plumbing in Mexico is also on the roof because that is where your water storage tank is unless you have a pressure system. The foam is both to lighten the load and to better insulate from the sun. The orange tubing is where the electrical wires are run - after