The roof tile installation has started. First photo is yesterday filling in the first section. They lay out rows (rayas) at a measured slope, about 4 inches at the highest point down to one inch in the direction the water will drain.
The second foto is starting a small section off to the side and the main section is done. When finished with a third large section this all will all be covered with a thin wash of cement and sealer (sellador)
Day one - filling between the 'rayas'
Day two - first large section done
0 comments:
Post a Comment