When cement roofs are poured they require lots of support to hold the weight and also just something for the cement to sit on (obvious). Well here we needed three loads of flat lumber and support posts to hold a 125 meter roof. Took the crew a day and a half to put it up and the wood will remain for a little over two weeks while the cement cures and dries.
The roof actually got poured yesterday (Saturday) and I've begun the twice a day watering (sunset and sunrise) to let it dry slowly. So far the crews have been great and priced under estimates. Next will be about the roof pour and preparation.
One load of lumber
Filling rooms with support posts
Roof is about half done
All wood supports in, rebar in along with plumbing and electrical
Cement roof in Mexico