Got the same good crew back that built the bodega and plan to finish the plumbing, electric and roof in the next few weeks. Made a lot of changes of windows and doors, opened up the inside of the house, added another room off the front side. Extended the bathrooms a few feet so everything is inside. No sink in the bedrooms (motel style). The roof also had a 20mm pitch and we decided to level it for future construction above. I eliminated the back bathroom and will just use the old bedroom area as a bodega and workshop.
Next week will be the wooden supports for the roof pour and then installing the electric and plumbing on top of the supports along with a large amount of rebar. We also decided to run a beam the length of the house that will be hidden inside the cement (not showing above or below).
Next week will be the wooden supports for the roof pour and then installing the electric and plumbing on top of the supports along with a large amount of rebar. We also decided to run a beam the length of the house that will be hidden inside the cement (not showing above or below).
Foundation of new room
Walls almost up on new room
New doorways through the house
0 comments:
Post a Comment