About 2000 bricks are moved inside, a new door is installed and malla ciclon (cyclone fence) on the windows. That work was done in only two months because of a hold up getting Seguro and problems with a Presta Nombre from hell.
Showing posts with label windows. Show all posts
Showing posts with label windows. Show all posts
Sunday, February 28, 2016
Monday, February 28, 2011
Doors and windows
Doors and windows seem to almost make the difference. I guess it's the privacy and security that they bring. I opted for steel windows with the built in security rather than aluminum windows with bars on the outside. I never did compare prices but assume steel is cheaper than a 'two step process'.
I do have to paint these, install the glass and caulk around the edges so they are not finished by any means. The screens (mosquitero) is coming Wednesday.
We also built a small foundation for the walkway all around the house which is basically one meter wide. Incorporated into the walkway is a registro cover for grey and rain water, redoing the registro top for black water and a drainage registro at the bottom of the stairs which will hopefully handle some of the roof rain water as well.
The walkway foundation, 2 registros and windows
,Front door - salon
Kitchen window
Subscribe to:
Posts (Atom)



